Arlington Ridge Center (ARC) (Phase 4)

Lamp Incorporated is the Construction Manager for the following Arlington Heights Park District projects:

This page is dedicated to Phase 4 (Phases 1, 2, and 3 are linked above). Portions of this phased project are in progress. Photos coming soon for phases 2, 3, and 4. 

You can read more about the project here.

Arlington Heights Park District – ARC Addition & Renovation

Lamp Incorporated served as Construction Manager for the addition and renovation of the Arlington Heights Park District’s ARC (Administration and Recreation Center) facility. The project modernized and expanded the existing building to support enhanced district operations, public programming, and long‑term facility performance, while maintaining continuity of park district services throughout construction.

The scope of work included selective demolition and renovation of existing interior spaces, construction of a new building addition, and reconfiguration of administrative, program, and support areas. Interior improvements featured new partitions, finishes, casework, doors, and hardware, flooring, ceilings, and upgraded building systems. Mechanical, electrical, plumbing, fire protection, and life‑safety systems were extensively modified and enhanced to meet current code requirements, improve energy efficiency, and support the expanded facility footprint.

Exterior and site improvements included utility connections, paving, pedestrian access upgrades, accessibility improvements, and coordination with adjacent park facilities. Lamp managed work within an active operational environment, coordinating multiple trade partners, maintaining safety and access for staff and visitors, and delivering phased construction to minimize disruption.

Working in close collaboration with the Arlington Heights Park District and the project’s design and engineering partners, Lamp delivered a high‑quality facility upgrade that strengthens the district’s ability to serve the community and support future programming needs. (16944, 17038)

  • Owner

    Arlington Heights Park District

  • Location

    Phase 1 – 3: 500 E. Miner Street, Arlington Heights, IL 60004

    Phase 3: 501 E. Miner Street, Arlington Heights, IL 60004

    Phase 4: 660 N. Ridge Avenue, Arlington Heights, IL 60004

  • Project Dates

    Phase 1 was completed in June 2025

    Phase 2 is in progress

    Phase 3 is in progress

    Phase 4 is in progress

  • Architects/Engineers

    Phases 1, 2, and 3 –  Landscape Architect: Hitchcock Design Group; Civil: Eriksson Engineering Associates, Ltd.

    Phase 3 – FGM Architects (Community Building renovation and aquatic facilities)

    Phase 4 – FGM Architects; Civil: Eriksson Engineering Associates, Ltd.; Hitchcock Design Group supported site and landscape design elements