Fire Station 2 Renovation & Fire Station 1 Flooring

Oswego Fire Protection District Fire Station No. 2 Renovation and Roof Replacement

Lamp Incorporated provided construction management services for the 11,927‑square‑foot renovation and modernization of Fire Station No. 2 for the Oswego Fire Protection District, enhancing facility performance, firefighter safety, and emergency response operations.

This project included comprehensive interior renovations, building system upgrades, and full roof replacement within an active fire station environment. Scope elements included reconfigured interior spaces, updated finishes, improvements to mechanical, electrical, and plumbing systems, and the installation of a new high‑performance roofing system and associated flashing, insulation, and drainage components to enhance building durability and weather protection.

Construction was executed within a fully operational, 24/7 emergency response facility, requiring a multi-phase construction approach to maintain uninterrupted service. Work was carefully sequenced and coordinated with station personnel, incorporating temporary accommodations, controlled work zones, roofing protection measures, and strategic scheduling of critical systems work to ensure continuous readiness and safety.

The renovated facility provides improved functionality, enhanced working conditions, and upgraded building systems, along with a durable, efficient building envelope, enabling the Oswego Fire Protection District to better serve the community with reliable, modern infrastructure.

(16913 & 16986)

Oswego Fire Station No. 1 – Flooring Replacement (LVT)

Lamp Incorporated provided construction management services for the luxury vinyl tile (LVT) flooring replacement at Fire Station No. 1, supporting the Oswego Fire Protection District’s commitment to maintaining safe, durable, and high‑performance public safety facilities.

The project included the removal and replacement of existing floor finishes with new resilient LVT flooring systems, designed to withstand the demands of a 24/7 emergency response environment. Work also involved substrate preparation, moisture mitigation as needed, and installation of new base and transition materials, ensuring long-term durability, ease of maintenance, and improved aesthetics.

Construction was completed within a fully operational fire station, requiring careful coordination and phased installation to maintain uninterrupted emergency services. Work was strategically sequenced with station personnel, utilizing controlled work areas, temporary access paths, and daily coordination to ensure safety and continuous operational readiness.

Upon completion, the upgraded flooring system provides a durable, low‑maintenance solution that enhances safety, functionality, and longevity within this active public safety facility.

(16984)

  • Owner

    Oswego Fire Protection District

  • Location

    2200 Wiesbrook Drive, Oswego, IL 60543

  • Project Date

    Station No. 2 – Completed March 2025 (Roofing September 2025)

    Station No. 1 – September 2025

  • Architect

    Studio 222 Architects, LLC

  • Contact Us

    Get in touch with us today and allow our team of construction professionals to guide you on your next steps.