Ela Area Public Library – Interior Renovation Projects

2026 HVAC Updates:  This project includes comprehensive HVAC upgrades throughout the Ela Area Public Library to improve system performance and reliability. The scope includes removal and replacement of an existing chiller and air distribution equipment, along with upgrades to building instrumentation and controls. (17031)

2026 Interior Renovations: This project includes interior renovations at the Ela Area Public Library to improve functionality and user comfort. The scope features new flooring, acoustic enhancements, lighting replacement, and miscellaneous electrical improvements to modernize public spaces. (17048)

2023 Interior Renovations: The project comprised a 17,500 SF renovation to both levels of a 2-story library, including improved traffic flow to book drops and self-service stations, new public meeting rooms, a new service desk, and new workrooms, walls, finishes, flooring, and ceilings throughout. Improvements to mechanical, plumbing, and electrical systems, and new lighting throughout, are also included. (16675)

Ribbon Cutting Video Clip – Welcoming Ela Library’s NEW Lyngsoe Sorter!

  • Owner

    Ela Area Public Library

  • Location

    275 Mohawk Trail, Lake Zurich, IL

  • Project Dates

    • 2026 HVAC Updates, completed May 2026
    • 2026 Additional interior renovation work (Aug. – December 2026)
    • 17,500 Two-Story Renovation was completed in May 2023
  • Architect

    product architecture + design

  • Contact Us

    Get in touch with us today and allow our team of construction professionals to guide you on your next steps.