The County of DuPage – Wheaton, IL – Multiple Projects
The following is a list of projects performed for The County of DuPage between 2022 – 2024:
- 410 Power Plant – New High-Temperature Heating Water Expansion Tank
- The scope of work includes adding a new custom expansion tank, dump valve, fill path, and controls to the existing high-temperature hot water heating system to allow the shutdown and inspection of the existing tank without requiring a plant shutdown.
- JTK Building Improvements
- The scope of work includes work in 2 areas of the building:
- Community Services Intake Improvements: including demolition of the existing interview rooms and replacing with new reception and waiting areas.
- Main Entrance Security Improvements: consist of providing a new secured entry into the Jack T. Kneupfer Administration building that includes reconfiguring the security desk and installation of a new exterior ADA accessible prefabricated concrete ramp.
- The scope of work includes work in 2 areas of the building:
- Door 10 Exterior Improvements
- The scope of work includes exterior improvements outside of Door 10 including the removal of and new construction of a building entrance stair, landings, and railings.
- Auditor Office Renovation
- 421 Building Secured Entrance Renovations &HVAC
- Warehouse Electrical Renovations
- 421 Building Concrete Repairs and Trash Tipper
- 400 Building Care Center Renovations
- 421 Building 3rd Floor Community Services
- 421 Board Room Improvements